ADU Construction in Glendale

Backyard ADUs and garage conversions in Glendale, placed around overhead wires, the sewer lateral and setbacks, then drawn, permitted and built.

Ask for a written quote

We read every request ourselves and reply about the job you describe, nothing else. How we use your details.

To send, add your first name and a phone number or an email.

On a Glendale lot we look up before we dig. The first measurement is how high the service wires to the main house hang and where they cross the yard. A new roof needs clearance under those lines, so their path can rule out a corner that looks open on paper. After that we run a tape along the side yard, where every lumber load and the concrete hose will have to pass.

Wires, pipes and the footprint

Overhead service is only one of the lines that decide where a backyard unit can go. The sewer lateral has to fall toward the street, so a unit placed far behind the house may need a deeper trench or its own pump. We also find the electrical panel and the gas meter, since a new subpanel and a long gas run add length to the job. With all of it marked on a survey, the footprint gets settled on paper, and the drawings start from a layout the city can review without a redesign.

A shell for inland sun and wind

Inland lots take strong afternoon sun and dry wind for long stretches, then the occasional hard storm. We pick a pale roof surface with a radiant barrier beneath the sheathing, vents sized to move hot air out of the rafter bays, and cement plaster or fiber cement laid over building wrap that laps shingle-style. Every window gets a sloped sill pan and taped flashing before trim goes on. Gutters feed downspouts that carry roof water away from the new footing, so the soil under it stays at an even moisture level.

About ADU ConstructionEverything in Glendale

ADU Construction in Glendale: questions

Talk to us about your Glendale project

Ask for a written quote or a call back. If photos would help, we ask for them when we reply.