ADU Construction in Eagle Rock

Backyard ADUs and garage conversions in Eagle Rock, drawn and built with fiberglass windows, drained walls and a cool roof for inland sun and storms.

Ask for a written quote

We read every request ourselves and reply about the job you describe, nothing else. How we use your details.

To send, add your first name and a phone number or an email.

Fiberglass window frames are the material we specify first on an Eagle Rock ADU. They grow and shrink with heat at nearly the rate of the glass they hold, so the seals around each pane stay tight as an inland day swings from hot to cool, and the frames do not soften or bow under strong sun. Each one sits on a sloped pan tucked into the weather barrier. We draw the unit, file the set and build what gets approved.

Windows that keep their seal

A frame that moves more than its glass slowly works the glazing seal loose, and a loose seal lets dust and water in and lets the gas between the panes leak away. Fiberglass avoids most of that movement, and it holds paint well if a darker color suits the house better later. We order dual-pane, low-e glass for walls facing the afternoon sun and keep openings modest on the hottest side. Every rough opening gets a sill pan pitched to the outside, flexible flashing tape lapped over the nailing fin at the sides and head, and a drip cap above. You see an opening flashed before any siding hides it.

The rest of the shell and city review

Around those windows, walls and roof are chosen for what any inland lot can expect: long sunny stretches, dry gusts that push grit into gaps, and the odd downpour that overruns a gutter. We draw a pale roof surface with peel-and-stick membrane lapped up from each eave, insulation filling every rafter bay to the state energy standard, and fiber cement siding hung on a drained wrap. Permits for Eagle Rock come from the City of Los Angeles, whose plan checkers look at setbacks, height and the new utility hookups. Drawing the set, filing it, clearing corrections and calling for each inspection fall to us. City permit fees appear on a separate line of your written quote from the drawing set.

About ADU ConstructionEverything in Eagle Rock

ADU Construction in Eagle Rock: questions

Talk to us about your Eagle Rock project

Ask for a written quote or a call back. If photos would help, we ask for them when we reply.