ADU Construction in Studio City

Studio City ADUs drawn around what City of Los Angeles plan check reviews: setbacks, building separation and utility runs, with a shell built for valley sun.

Ask for a written quote

We read every request ourselves and reply about the job you describe, nothing else. How we use your details.

To send, add your first name and a phone number or an email.

Whoever picks up a Studio City ADU set at City of Los Angeles plan check wants three things settled on the site plan: how far the unit stands from the rear and side lines, how much space separates it from the main house, and how tall its roof rises. We dimension those before drawing any room, then check them with string lines. Inland valley lots can see hard afternoon sun and a heavy storm now and then, so the shell is detailed for both.

What plan check reads on the site plan

Setback lines come ahead of floor area in a reviewer's eyes. Our site plan draws the property lines from the survey or the recorded lot dimensions, places the unit inside them, and shows any eave or step that reaches past one. The reviewer also follows the sewer connection back to the main house and asks where the new electrical service comes from, so those runs appear on the same sheet with their lengths noted. Where a wall lands close to a property line, the code calls for fire-rated construction on that face, and we mark it on the plan. Comments from the city get a written reply, and the corrected sheets go back together.

Roof, walls and windows for a valley yard

Once the placement holds up on paper, the building skin gets its own detail sheet. A light colored roof covering and a vented attic packed with deep insulation keep the rooms from soaking up afternoon heat. Windows facing the afternoon sun stay modest, with an overhang above them wherever the setbacks leave space for one. Each rough opening receives a sloped sill pan, jamb tape and a head flashing lapped under the wall wrap, which turns storm water back out before it reaches the framing. Stucco goes over a doubled weather barrier with a clear weep screed at its base, and hold downs are sized by the engineer for seismic loads.

About ADU ConstructionEverything in Studio City

ADU Construction in Studio City: questions

Talk to us about your Studio City project

Ask for a written quote or a call back. If photos would help, we ask for them when we reply.